Skip to content
Solar Farm Facts
- 563 kilowatt (kW) Solar photovoltaic (PV) System
- Online: October 2018
- Footprint: 3 acres Golden Valley Electric Association (GVEA) Solar Graphic
- Contractor: ABS Alaskan, Inc.
- Panel manufacturer: CSUN
- Each of the 1,760 panels will generate up to 320 watts.
- Contractor: ABS Alaskan, Inc.
- Cost: $850,000 after a $225,000 grant supplied from United States Department of Agriculture (USDA) Rural Energy for America Program (REAP)
- Annual energy production is estimated to equal the annual energy used in 71 homes (using an average of 660 kilowatt-hours (kWh) per month)
- Located on GVEA property next to BESS and Wilson Substation – Visible from VanHorn Road
Gambling-software-info@gafurnish.com
AKB48中国官方网站
LOL外围下注
冰球突破
冰球突破
神州租车特惠活动专区
VIP部落
Macau-New-Portuguese-capital-contactus@palosconstruction.com
Puck-break-contactus@mamababyandbeyond.com
利记
Online-gambling-platform-billing@knowableresearch.com
泰达人才网
国家信访局
瑞士军刀包官网
CNBA篮球网
作文网
国家粮食局
千龙网视频频道
齐鲁教育
好巧网